Industry model

HVAC & Building Services

Commercial HVAC, mechanical and building services contractors: planned preventive maintenance regimes (SFG20), reactive callouts, statutory compliance inspections, small works and subcontractor management.

24
Processes
8
Domains covered
1,117
Details worked out
24
Diagrams

Asset Management

A1.HV02

Building Asset Survey & Asset Register Build

Covers the physical survey of HVAC and building services plant across a site or estate and the construction of a structured, hierarchical asset register that PPM regimes can be built on. Each asset is captured with type, location, condition, criticality and nameplate data, then individually linked to the correct maintenance schedule. Poor asset data at this stage is one of the most common reasons PPM programmes drift out of compliance.

IFS Cloud Enterprise Asset Management
48 details
diagram
A1.HV45

LOLER Thorough Examination of Lifting Equipment

Manages the register of lifting equipment and lifting accessories in a building or service portfolio and the statutory thorough examination regime that keeps each item lawfully usable, from interval derivation through competent-person examination, report capture, defect handling and record retention. Jurisdiction: UK, under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), with in-between inspection and maintenance duties arising under PUWER. Covers passenger and goods lifts, hoists, MEWPs, gantry and jib cranes, davits and the accessory population.

IFS Cloud Maintenance
46 details
diagram
A3.HV26

Do-and-Charge Quote-to-Cash (reactive job billing)

Runs the full commercial cycle for chargeable reactive HVAC work that is executed on a time-and-materials or schedule-of-rates basis rather than under a fixed contract fee. Captures labour, travel, parts, subcontract and access costs against the work order, applies the contractual pricing basis, and produces a substantiated invoice fast enough to protect cash flow. Includes the WIP review that separates genuinely chargeable work from work already covered by the maintenance contract or warranty.

IFS Cloud Maintenance - Work Order Management
46 details
diagram
A3.HV47

Remedial Action Tracking (from inspection findings to closure)

Converts every finding from a statutory inspection into a tracked remedial action with the right urgency path, drives it through quoting, approval and execution where it falls outside contract scope, and closes it with evidence that flows back to the original compliance record. The urgency path is dictated by the regime: immediate cessation of use, remediation within the period specified on the examination report, or a mandated re-test after repair. Jurisdiction-specific rules are configured per regime rather than as a single generic SLA.

IFS Cloud Maintenance
46 details
diagram
A4.HV03

PPM Regime Setup (SFG20 Task Library Alignment)

Covers turning a validated asset register into a configured preventive maintenance regime aligned to a recognised task library such as SFG20, including task selection by criticality, frequency setting, skill-level assignment and version control against the source standard. The regime records which tasks are statutory, which are business critical and which are discretionary, so scope decisions are defensible to auditors and insurers. Because the underlying standard is updated continuously, regime setup also establishes the review-and-apply mechanism that prevents compliance drift.

IFS Cloud Enterprise Asset Management
48 details
diagram
A4.HV41

Gas Safety Inspection & Landlord/Commercial Gas Safety Record (LGSR)

Plans, executes and records statutory gas safety inspections of gas appliances, fittings and flues across a landlord or commercial property portfolio, and produces the gas safety check record (the Landlord Gas Safety Record, historically referred to as a CP12) for each property. In the UK the Gas Safety (Installation and Use) Regulations 1998 govern the record content, who may issue it, and its distribution and retention. The process covers scheduling the 12-month cycle, dispatching a Gas Safe registered engineer, capturing the mandated record fields, issuing the record and driving any remedial action.

IFS Cloud Maintenance
45 details
diagram
A4.HV43

Legionella & Water Hygiene Monitoring (L8/HSG274 regime)

Turns the written legionella risk assessment for each water system into a scheduled monitoring and sampling regime, captures the control-regime readings and laboratory results, and drives remedial action where control is not being achieved. Jurisdiction: UK, where the regime is set by the HSE Approved Code of Practice L8 and the HSG274 technical guidance, with Part 1 covering evaporative cooling systems and Part 2 covering hot and cold water systems. Monitoring frequency is risk-assessment driven, with a published minimum for open systems.

IFS Cloud Maintenance
46 details
diagram
A4.HV44

Fire & Life-Safety System Testing (detection, suppression, dampers, AOV)

Schedules and evidences periodic testing of fire and life-safety systems across a building portfolio: detection and alarm, suppression, fire and smoke dampers, and automatic opening vents. Jurisdiction: UK, where fire damper testing frequency is set out in BS 9999:2017 and the inspection methodology in the BESA DW 145 guidance, against statutory duties under the Regulatory Reform (Fire Safety) Order 2005, with higher-risk buildings additionally subject to Golden Thread information requirements under the Building Safety Act 2022. Frequencies for detection, suppression and AOV sub-systems must be taken from the governing standard for the building and jurisdiction.

IFS Cloud Maintenance
46 details
diagram
A5.HV04

PPM Schedule Generation & Route Optimisation

Covers converting the configured PPM regime into a dated, resourced annual maintenance plan and then optimising the resulting visits into efficient engineer routes. Tasks of differing frequencies are consolidated into visits, visits are levelled against labour capacity and statutory due dates, and journeys are sequenced to reduce travel while protecting compliance windows. The output is the annual planner the client signs off and the work order pipeline the mobile workforce executes against.

IFS Cloud Maintenance Planning
50 details
diagram
A7.HV07

Maintenance Contract Billing Models (Fixed, Schedule-of-Rates, Comprehensive)

Covers configuring and running the commercial models a building maintenance contract is billed under: fixed periodic price for the PPM regime, schedule-of-rates pricing for reactive and additional works, and comprehensive or fully-inclusive cover where parts and repairs sit inside the fee. The chosen model determines how completed work is priced, what evidence must accompany an invoice, and where the provider carries risk. The objective is billing that is defensible against delivered evidence and free of revenue leakage.

IFS Cloud Service Management
49 details
diagram
A7.HV27

SLA / KPI Measurement & Service Credit (penalty) Management

Measures delivered performance against every contracted SLA and KPI across reactive and planned HVAC work, then calculates, agrees and applies any service credits or performance deductions that fall due. Produces the auditable evidence pack used at monthly client review and at renewal. Feeds breach root causes back into intake, dispatch and parts processes so the same failure is not paid for twice.

IFS Cloud Maintenance - B2B Contracting and Equipment Effectiveness
47 details
diagram

Procurement

PR3.HV66

Subcontractor Assignment & Job Sheet Return

Awards HVAC work to an approved subcontractor and gets a compliant job sheet back. Covers contractor selection against agreement and coverage, issue and acceptance of the contractor order within the acceptance window, allocation to a named operative, work execution and reporting of time, materials and expenses, return of the job sheet with certificates, photographs and signature, and conversion of reported work into payment lines ready for authorisation.

IFS Cloud Service Management
47 details
diagram
PR4.HV67

Subcontractor Invoice Validation & Self-Billing

Controls what an HVAC business actually pays its subcontractors. Covers confirmation and authorisation of payment lines against the agreement and not-to-exceed limits, purchase order creation including batch and charge-period modes, periodic self-billing invoice plans, the sub contract valuation and payment certificate route for construction-style packages, matching of the subcontractor invoice, and transfer of the resulting transactions to finance.

IFS Cloud Procurement
47 details
diagram
PR5.HV65

Subcontractor Onboarding & Accreditation

Registers, vets and approves the external contractors an HVAC business relies on for specialist trades, geographic coverage and peak capacity. Covers classification by contractor type, commercial and supplier registration, insurance, health and safety and competence accreditation, and a gated onboarding checklist that must be complete before work can be awarded, plus setup of the cost, resource and portal framework that lets the contractor be assigned and paid.

IFS Cloud Service Management
47 details
diagram

Engineering

Human Capital Management

Projects

Supply Chain

Business Enablers

Sales & Service Management

What a license opens

Everything you can see here is real and current, the names, the structure and the counts come straight out of the ModelIFS library and change as it grows. What sits behind the license is the worked-out content itself: the execution steps, the data each one needs, the configuration decisions, the KPIs, the integration points, the workshop questions and the diagrams. That is the part you would otherwise spend a program building from nothing.

Sign in to open it