Repetitive Manufacturing
Production Line & Takt Time Planning
Define production lines as the organizational level between site and work center, connect parts, inbound/outbound locations, work centers and report points, and plan capacity by comparing takt time for a sampled demand period against alternative routings to synchronize production rates with demand.
Line-Rate Production Scheduling
Generate and manage rate-based production schedules for manufactured line parts using Load Infinite, Forward up to Line Rate or Backward up to Line Rate load methods, managing planned vs firm horizons so schedules replace shop orders as the execution vehicle in repetitive environments.
Repetitive Production Reporting & Backflush
Report production against a schedule at completion or progress points, using backflush to automate component material issues and operation machine/labor transactions; each production schedule report logs material, machine and labor cost via BOM and routing, with reverse receipt/backflush for corrections.
Kanban Replenishment
Set up kanban circuits (source/destination, part, replenish type and signal type), size them with kanban calculations (basic or constant-cycle) and simulations, and fulfill replenishment by reporting kanban supplier receipts, distribution orders or transport tasks to drive lean pull-based supply.
Line-Driven Shop Order Coordination
Coordinate mixed-mode manufacturing where MRP stops at the production-line part: the line breaks down demand to components and creates/releases component shop orders or shop order requisitions based on line workload, sequence, lot size and component availability, generating downstream purchase/shop requisitions on release.
Everything you can see here is real and current, the names, the structure and the counts come straight out of the ModelIFS library and change as it grows. What sits behind the license is the worked-out content itself: the execution steps, the data each one needs, the configuration decisions, the KPIs, the integration points, the workshop questions and the diagrams. That is the part you would otherwise spend a program building from nothing.
Sign in to open it