A1.G22 · Maintenance

Meter Set Installation & Exchange

Covers installing a new gas meter set and exchanging meters at end of life, on periodic change-out, or on AMI upgrade, executed in IFS Cloud as Work Orders against the serialised meter install base. The meter and regulator are handled as Serial Objects mounted on the premise Functional Object so the removed and installed serials, index readings and seal numbers form an auditable chain. The process closes when the exchange is posted to CIS and the removed meter is dispositioned to test or scrap.

44 details worked out · license requiredGas Utility variantMaster

Execution steps

6 steps

Sign in

The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.

Data requirements

12 requirements

Sign in

Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.

Configuration decisions

5 decisions

Sign in

The choices this process forces you to make in IFS, named up front. Finding these in week nine of a program is what makes week nine expensive.

KPIs

5 measures

Sign in

What this process is measured on, so the reporting requirement is known before the process is configured rather than after go-live.

Integration points

4 integrations

Sign in

Where this process has to talk to something outside IFS, and what crosses the boundary.

Workshop questions

6 questions

Sign in

The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.

Prerequisites

3 prerequisites

Sign in

What has to be true before this process can run at all: master data, other processes, setup completed elsewhere.

Industry variants

3 variants

Sign in

How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.

Process diagram

1 BPMN diagram

Sign in

A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.

Sources

1 citation

Sign in

Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.

Every process in the library looks like this.

44 details are already worked out for this one process. A license opens them, and the other 619 processes with them.