A4.OG25 · Enterprise Asset Management (Maintenance)

Pressure Vessel & Relief Device Inspection

Delivers the mechanical integrity inspection programme for pressure vessels, associated process piping and pressure relief devices at pump stations, compressor stations and terminals, held in IFS Cloud as Equipment and Serial Objects with design and set-pressure attributes. Inspection intervals are configured as PM Actions bounded by the API 510 and API 570 ceilings, and relief device shop test and overhaul cycles follow the API 520 Part II maximum interval. Thickness Measurements at condition monitoring locations drive remaining-life evaluation, rerating, repair or removal of the item from service.

46 details worked out · license requiredOil & Gas variantMaster

Execution steps

6 steps

Sign in

The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.

Data requirements

14 requirements

Sign in

Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.

Configuration decisions

4 decisions

Sign in

The choices this process forces you to make in IFS, named up front. Finding these in week nine of a program is what makes week nine expensive.

KPIs

5 measures

Sign in

What this process is measured on, so the reporting requirement is known before the process is configured rather than after go-live.

Integration points

4 integrations

Sign in

Where this process has to talk to something outside IFS, and what crosses the boundary.

Workshop questions

6 questions

Sign in

The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.

Prerequisites

4 prerequisites

Sign in

What has to be true before this process can run at all: master data, other processes, setup completed elsewhere.

Industry variants

3 variants

Sign in

How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.

Process diagram

1 BPMN diagram

Sign in

A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.

Sources

3 citations

Sign in

Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.

Every process in the library looks like this.

46 details are already worked out for this one process. A license opens them, and the other 619 processes with them.