Gas Leak Repair Recheck
Enables reinspection of completed leak repairs per compliance regulations. The task is auto-created with compliance dates in EAM, assigned via PSO, and the technician documents gas readings and leak grade at the repair location. If readings remain, the leak repair process restarts; otherwise the leak is closed.
Execution steps
6 steps
The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.
Data requirements
16 requirements
Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.
Workshop questions
3 questions
The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.
Industry variants
1 variant
How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.
Process diagram
1 BPMN diagram
A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.
Sources
1 citation
Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.
Every process in the library looks like this.
26 details are already worked out for this one process. A license opens them, and the other 619 processes with them.
