A4.U05 · IFS Preventive Maintenance

Distribution Main Leak Survey

Cyclical (1/3/5-year) leak survey of distribution mains (O&M-INSP-09) walking or driving the network to detect gas leaks, documenting readings and grading discovered leaks to trigger the leak repair process.

25 details worked out · license requiredGas Utility variantMaster

Execution steps

5 steps

Sign in

The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.

Data requirements

16 requirements

Sign in

Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.

Workshop questions

3 questions

Sign in

The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.

Industry variants

1 variant

Sign in

How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.

Process diagram

1 BPMN diagram

Sign in

A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.

Sources

1 citation

Sign in

Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.

Every process in the library looks like this.

25 details are already worked out for this one process. A license opens them, and the other 619 processes with them.