A5.OG01 · Enterprise Asset Management

Well Integrity Management

Manages the lifecycle integrity of producing, injection and suspended wells by representing wells and their barrier elements in the IFS Cloud asset structure and driving periodic barrier verification through Maintenance Plans and Work Orders. Annulus pressure, subsurface safety valve tests and barrier element inspections are captured as Measurements against the well object, evaluated against defined limits, and exceptions raised as Fault Reports. Degraded barriers escalate to remedial Work Orders or a controlled shut-in, with the full evidence trail retained in IFS Document Management.

47 details worked out · license requiredOil & Gas variantMaster

Execution steps

6 steps

Sign in

The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.

Data requirements

13 requirements

Sign in

Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.

Configuration decisions

5 decisions

Sign in

The choices this process forces you to make in IFS, named up front. Finding these in week nine of a program is what makes week nine expensive.

KPIs

5 measures

Sign in

What this process is measured on, so the reporting requirement is known before the process is configured rather than after go-live.

Integration points

5 integrations

Sign in

Where this process has to talk to something outside IFS, and what crosses the boundary.

Workshop questions

6 questions

Sign in

The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.

Prerequisites

4 prerequisites

Sign in

What has to be true before this process can run at all: master data, other processes, setup completed elsewhere.

Industry variants

3 variants

Sign in

How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.

Process diagram

1 BPMN diagram

Sign in

A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.

Sources

4 citations

Sign in

Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.

Every process in the library looks like this.

47 details are already worked out for this one process. A license opens them, and the other 619 processes with them.