Asset Health Scoring & Risk-Based Investment Planning
Turning condition, age, duty and failure data into an asset health index per asset class, combining it with consequence of failure to produce a risk score, and using that score to rank maintenance, refurbishment and replacement investment across the T&D portfolio. In IFS Cloud the inputs are already resident - inspection Measurements/Parameters, Fault Report history and Work Order cost against Functional Objects, Serial Objects and Linear Asset segments, with Criticality carrying the consequence dimension - and the scored output drives PM regime changes, corrective work prioritisation and the capital project pipeline. The framework is the CIGRE and ISO 55000 model in which risk is probability of failure multiplied by consequence of failure, expressed through an asset health index.
Execution steps
6 steps
The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.
Data requirements
14 requirements
Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.
Configuration decisions
5 decisions
The choices this process forces you to make in IFS, named up front. Finding these in week nine of a program is what makes week nine expensive.
KPIs
5 measures
What this process is measured on, so the reporting requirement is known before the process is configured rather than after go-live.
Integration points
5 integrations
Where this process has to talk to something outside IFS, and what crosses the boundary.
Workshop questions
6 questions
The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.
Prerequisites
4 prerequisites
What has to be true before this process can run at all: master data, other processes, setup completed elsewhere.
Industry variants
3 variants
How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.
Process diagram
1 BPMN diagram
A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.
Sources
4 citations
Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.
Every process in the library looks like this.
48 details are already worked out for this one process. A license opens them, and the other 619 processes with them.
