Industry model

Electric Utility

Electric distribution planning, connections & metering

31
Processes
6
Domains covered
1,455
Details worked out
31
Diagrams

Asset Management

A1.E01

Customer Funded Sub Process – Only for Equipment Relocation (Without Meter)

Customer-funded equipment relocation (without meter): technical study, design/approval, cost confirmation, payment, execution and energization of the relocated equipment.

IFS Equipment & Installed Base
40 details
diagram
A1.E20

Meter Removal Sub Process

Meter Removal Sub Process is an electric distribution utility planning process executed across FSM/FSM Connect/FSM Mobile with SAP ISU and GIS integration. It is mapped to IFS Equipment & Installed Base and comprises 11 extracted steps covering request intake, validation, site/technical work and cost/work-order handling. Provenance is the client To-Be draw.io planning flows.

Equipment & Installed Base
41 details
diagram
A1.E22

Meter and Equipment Removal

Meter and Equipment Removal is an electric distribution utility planning process executed across FSM/FSM Connect/FSM Mobile with SAP ISU and GIS integration. It is mapped to IFS Equipment & Installed Base and comprises 25 extracted steps covering request intake, validation, site/technical work and cost/work-order handling. Provenance is the client To-Be draw.io planning flows.

Equipment & Installed Base
59 details
diagram
A2.P21

Overhead Distribution & Transmission Line Patrol and Inspection

Recurring visual and instrumented patrol of overhead distribution and transmission circuits, executed as ground patrol, aerial or helicopter flight, drone and LiDAR survey, and post-event damage assessment. In IFS Cloud the circuit is carried as a Linear Asset segmented span-by-span with poles, crossarms, insulators and switchgear held as Functional Objects against those segments, and patrol cycles are driven from Maintenance Plan / PM Action definitions that generate Work Orders and Work Tasks per segment. Inspectors record condition codes as Measurements/Parameters and raise Fault Reports for defects, which are triaged into priority bands that feed corrective work, wildfire mitigation and the asset health model.

Enterprise Asset Management
47 details
diagram
A2.P22

Wood Pole Inspection, Treatment & Replacement Program

The cyclic groundline program that keeps a wood pole fleet serviceable: excavate and sound or bore each pole, measure residual shell and strength, apply remedial preservative treatment, reinforce with a stub or truss where economic, and replace the poles that fail the reject criteria. In IFS Cloud each pole is a Functional Object positioned against the circuit Linear Asset, the inspection cycle is a Maintenance Plan / PM Action, and strength, decay and treatment results are recorded as Measurements/Parameters so that reject and treat decisions are auditable. Rejected poles become change-out Work Orders or, at volume, a funded replacement Project with materials drawn from Inventory Part and Purchase Order.

Enterprise Asset Management
47 details
diagram
A2.P23

Underground Cable Inspection, Testing & Replacement

Condition assessment and renewal of underground cable systems: manhole and vault inspection, cable and accessory diagnostics such as insulation resistance, VLF withstand, tan delta and partial discharge, fault location, and programmed section replacement or rejuvenation. In IFS Cloud the cable run is a Linear Asset segmented between terminations and splices, while joints, terminations, switchgear and network transformers sit as Functional or Serial Objects, and diagnostic results are captured as Measurements/Parameters against the tested section. Test results drive a disposition of return to service, retest sooner, rejuvenate or replace, and the replacement volume is planned as a Project with cable and accessory demand flowing through Inventory Part and Purchase Order.

Enterprise Asset Management
47 details
diagram
A2.P41

Vegetation Inspection Planning & Clearance Assessment (NERC FAC-003)

Plans and executes the recurring vegetation inspection programme for NERC-applicable transmission line rights-of-way and assesses observed clearance against the Minimum Vegetation Clearance Distance (MVCD) for each voltage class. In IFS Cloud the applicable circuits and ROW spans are modelled as Linear Asset segments, the inspection cycle is driven from Maintenance Plan / PM Action, and findings are captured on inspection Work Orders and Work Tasks. The resulting dated inspection records become the primary FAC-003-5 R6 compliance evidence.

Enterprise Asset Management (EAM)
46 details
diagram
A3.E01

Capex Work order Process

Capex work order lifecycle: design, planning and SAP Finance approval, budget tracking against material and labor cost, and completion/invoicing.

IFS Work Order Management
32 details
diagram
A3.E02

Contractor Invoice Process

Contractor invoice sub-process: on work-order completion, return balance and pulled-out material, reconcile inventory, SEC review/approval and completion certificate before invoice.

IFS Work Order Management
27 details
diagram
A3.E14

Integration Plan Preparation

Integration Plan Preparation is an electric distribution utility planning process executed across FSM/FSM Connect/FSM Mobile with SAP ISU and GIS integration. It is mapped to IFS Work Order Management and comprises 27 extracted steps covering request intake, validation, site/technical work and cost/work-order handling. Provenance is the client To-Be draw.io planning flows.

Work Order Management
55 details
diagram
A3.P43

Hazard Tree Identification & Removal

Identifies structurally defective, dead or dying trees inside and outside the right-of-way that could fall into an applicable line, and drives their prioritised removal. In IFS Cloud the finding is raised as a Fault Report or high-criticality Work Order against the Linear Asset span, with landowner consent, permits and crew qualifications tracked as supporting Documents. Immediate-risk conditions trigger the FAC-003-5 R4 control centre notification, and constrained removals trigger R5 corrective action.

Enterprise Asset Management (EAM)
44 details
diagram
A3.P44

Herbicide Application & Right-of-Way Management

Plans and executes selective herbicide and cultural control work that converts transmission and distribution rights-of-way to stable low-growing plant cover, under an integrated vegetation management plan. In IFS Cloud the treatment is issued as a Work Order and Work Tasks against Linear Asset spans, with product drawn as Inventory Part, procurement through Purchase Order and Supplier, and applicator certification held as Competency/Qualification. Application records are retained as regulatory evidence alongside NERC work plan evidence.

Enterprise Asset Management (EAM)
46 details
diagram
A4.P01

Substation Inspection Rounds & Infrared Thermography

Recurring route-based inspection rounds at transmission and distribution substations, combined with periodic infrared thermographic surveys of energized connections, bushings, bus work, breakers and cable terminations. In IFS Cloud the rounds are driven by Preventive Maintenance Actions against substation Functional Objects, executed as Work Orders and Work Tasks on mobile, with condition readings captured as Measurements and exceptions raised as Fault Reports. Thermal anomalies are graded by temperature rise and converted into prioritized corrective Work Orders.

Enterprise Asset Management (Maintenance)
46 details
diagram
A4.P03

Circuit Breaker & Switchgear Preventive Maintenance and Testing

Time-based and operation-count-based preventive maintenance and electrical testing of high-voltage circuit breakers, switchgear, disconnects and their operating mechanisms. In IFS Cloud this is driven by Preventive Maintenance Actions on breaker Functional Objects or Serial Objects, triggered by calendar interval and by operation counters recorded as Measurements, with test results captured against the object and defects raised as Fault Reports. Outage-dependent tasks are bundled into planned station outage Work Orders to minimise clearances.

Enterprise Asset Management (Maintenance)
48 details
diagram
A4.P04

Protection System Maintenance & Testing (NERC PRC-005)

Establishment and execution of a documented Protection System Maintenance Program covering protective relays, communications systems, voltage and current sensing devices, station DC supply and control circuitry that affect bulk electric system reliability. In IFS Cloud each protection system component type is registered as a maintainable object with the applicable maximum maintenance interval configured on a Preventive Maintenance Action, producing dated Work Orders and test records that serve as compliance evidence. Findings that cannot be corrected immediately are tracked as Unresolved Maintenance Issues through to closure.

Enterprise Asset Management (Maintenance)
48 details
diagram
A4.P05

Substation Battery & DC Auxiliary System Testing

Inspection, testing and replacement management of substation station DC supply - battery banks, chargers, DC distribution and associated alarms - which provide the tripping and control power for protection systems. In IFS Cloud the mandated inspection cycles are configured as Preventive Maintenance Actions on the battery bank and charger objects, with cell voltages, specific gravity, connection resistance and ohmic values recorded as Measurements trended against the commissioning baseline. Degradation trends and capacity test results drive planned bank replacement rather than reactive failure.

Enterprise Asset Management (Maintenance)
48 details
diagram
A4.P67

Generating Plant Preventive Maintenance & Operator Rounds

Runs the routine reliability engine of a generating plant: criticality-driven preventive maintenance programmes and recurring operator rounds that capture condition readings against plant assets. IFS Cloud holds the Maintenance Plans and PM Actions, the generated Work Orders and Work Tasks, and the Measurements captured on rounds, with out-of-limit readings converting into corrective work. The purpose is to convert emerging defects into scheduled or outage work rather than forced unit events.

Maintenance
47 details
diagram
A5.P02

Power Transformer Condition Monitoring (DGA & Oil Analysis)

Periodic and online monitoring of oil-filled power transformers, load tap changers and bushings using dissolved gas analysis and oil quality testing to detect incipient faults before failure. In IFS Cloud the sampling cycle is driven by Preventive Maintenance Actions against each transformer Functional Object or Serial Object, lab results are stored as Measurements against the object, and diagnostic exceedances raise Fault Reports that drive engineering assessment and corrective Work Orders. The resulting gas and oil history becomes the transformer health record used for risk ranking and replacement planning.

Enterprise Asset Management (Maintenance)
47 details
diagram
A5.P06

Predictive Maintenance / Condition-Based Monitoring Program (T&D Assets)

Programmatic shift from purely calendar-based maintenance to condition-based and predictive maintenance across transmission and distribution assets, using inspection findings, test results, online monitors and operating data to decide what work is done and when. In IFS Cloud the programme is built on Measurements and condition rules against Functional Objects that generate Work Orders only when a condition threshold or predicted failure risk is reached, with asset Criticality determining the response. The resulting risk view is used to reallocate maintenance spend and to feed asset investment planning.

Enterprise Asset Management (Maintenance)
48 details
diagram
A5.P26

Asset Health Scoring & Risk-Based Investment Planning

Turning condition, age, duty and failure data into an asset health index per asset class, combining it with consequence of failure to produce a risk score, and using that score to rank maintenance, refurbishment and replacement investment across the T&D portfolio. In IFS Cloud the inputs are already resident - inspection Measurements/Parameters, Fault Report history and Work Order cost against Functional Objects, Serial Objects and Linear Asset segments, with Criticality carrying the consequence dimension - and the scored output drives PM regime changes, corrective work prioritisation and the capital project pipeline. The framework is the CIGRE and ISO 55000 model in which risk is probability of failure multiplied by consequence of failure, expressed through an asset health index.

Enterprise Asset Management
48 details
diagram
A5.P42

Cycle Trim Planning & Contractor Crew Dispatch

Converts inspection findings and cycle policy into the annual vegetation work plan and dispatches contractor line-clearance crews against it. In IFS Cloud the plan is carried by Maintenance Plan / PM Action and Work Orders against Linear Asset spans, while contractor capacity, unit rates and settlement run through Supplier Agreement and Purchase Order. Completion tracking supports the FAC-003-5 R7 obligation to complete 100% of the annual vegetation work plan.

Enterprise Asset Management (EAM)
46 details
diagram
A5.P65

Planned Outage Coordination, Clearance & Tagging

Bundles outage-dependent maintenance, capital and inspection work into approved outage windows, obtains the operational and reliability approvals, and executes the clearance and tagging that protects the workforce. IFS Cloud holds the outage request, the bundled Work Orders and Work Tasks, the controlled clearance documents and the as-left asset record; switching authority and device operation remain with system operations. The process must also support late cancellation or recall of outages when system conditions change.

Maintenance
47 details
diagram
A6.P66

Generation Unit Outage Management (Planned & Forced)

Plans, executes and reports generating unit outages across the full event spectrum - planned overhauls and refuelling outages, maintenance outages, and forced events. IFS Cloud carries the outage scope as a Project or Maintenance Event with Work Orders and Work Tasks, the long-lead procurement, the component history on Serial Objects, and the event data needed for availability reporting. Correct event classification and cause coding is what makes the resulting availability statistics defensible.

Maintenance
47 details
diagram
A7.P24

Joint-Use & Pole Attachment Management

Administration of third-party attachments on utility poles end to end: attachment application intake, field survey, engineering and loading analysis, make-ready design and execution, permit issuance, periodic joint-use audit, unauthorized-attachment resolution, and annual rental billing. In IFS Cloud the pole is a Functional Object under the circuit Linear Asset with attachment records held against it, make-ready is executed as Work Orders or a small Project, and the attaching party is a customer whose rental and make-ready charges are raised through Customer Order and Service Contract. The whole process is timeline-driven because the FCC prescribes fixed day counts for survey, estimate, acceptance and make-ready completion.

Enterprise Asset Management
48 details
diagram

Business Enablers

Supply Chain

Projects

Procurement

Sales & Service Management

What a license opens

Everything you can see here is real and current, the names, the structure and the counts come straight out of the ModelIFS library and change as it grows. What sits behind the license is the worked-out content itself: the execution steps, the data each one needs, the configuration decisions, the KPIs, the integration points, the workshop questions and the diagrams. That is the part you would otherwise spend a program building from nothing.

Sign in to open it