H7.T65 · Service Management

Health & Safety Permits (Work at Height & RF Exposure)

Controls the two hazards that dominate telecom field work: climbing towers, poles and rooftops, and working close to live transmitting antennas. Covers hazard classification of the planned task, competency and equipment verification for the assigned crew, determination of the RF exposure regime against MPE limits, permit raising and authorisation, on-site issue and pre-climb checks, and permit close-out with the evidence retained. In IFS Cloud the permit and its controls hang off the Work Order, and the competency check gates which resources can be dispatched at all.

48 details worked out · license requiredTelecommunications variantMaster

Execution steps

6 steps

Sign in

The sequence somebody actually follows in IFS Cloud, step by step, written for a person doing the work rather than for a diagram.

Data requirements

14 requirements

Sign in

Every entity this process needs, mapped to its IFS object, marked mandatory or optional, with the source system it comes from. This is the list a data migration is built from.

Configuration decisions

5 decisions

Sign in

The choices this process forces you to make in IFS, named up front. Finding these in week nine of a program is what makes week nine expensive.

KPIs

5 measures

Sign in

What this process is measured on, so the reporting requirement is known before the process is configured rather than after go-live.

Integration points

5 integrations

Sign in

Where this process has to talk to something outside IFS, and what crosses the boundary.

Workshop questions

6 questions

Sign in

The questions to ask the business about this process, written before the workshop. This is the difference between a design session and a discussion.

Prerequisites

4 prerequisites

Sign in

What has to be true before this process can run at all: master data, other processes, setup completed elsewhere.

Industry variants

3 variants

Sign in

How this process differs by industry: the parts a utility does differently from a manufacturer, already worked out rather than discovered.

Process diagram

1 BPMN diagram

Sign in

A real BPMN diagram, editable in the platform, not a picture of one. It is the same diagram your team will annotate in the workshop.

Sources

7 citations

Sign in

Where this came from. Every process traces back to IFS documentation and release notes, so a claim about how IFS behaves can be checked rather than believed.

Every process in the library looks like this.

48 details are already worked out for this one process. A license opens them, and the other 619 processes with them.